Guodian Weifang Binhai Wind Farm Phase II Project
#369of 1935 in Renewable energy#139of 1084 in China#237of 1459 in CDM (UNFCCC)#273of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in China with a jurisdictional grid-emission-factor baseline and a VVB-confirmed combined additionality test. The validation report documents nine closed corrective actions (all documentation corrections) and a 0% leakage deduction deemed negligible, which is reasonable for a wind project. However, no monitoring reports or verified emission-reduction figures are available in the extracted record, limiting the ability to confirm actual delivery against the claimed 575,484 tCO₂ lifetime estimate.
Red Flags
- No monitoring report or verified ERR figure is present in the extracted record, so actual credit delivery cannot be confirmed against the claimed 575,484 tCO₂ lifetime estimate.
- Nine material findings (CARs) in the validation report indicate initial documentation deficiencies in the PDD, including inconsistent electricity generation values and outdated methodology/additionality tool versions, though all were closed.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Wind avoidance – no inherent reversal risk
0% deemed negligible – appropriate for wind
Jurisdictional grid EF (2011)
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →