Skip to main content
CDMWindChinaACM0002

Guodian Wendeng Zijinshan Wind Farm Project

CDM-7601 ↗

#850of 1935 in Renewable energy#438of 1084 in China#601of 1459 in CDM (UNFCCC)#663of 1287 in ACM0002

5.3/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
5.0
Documentation
5.5

Audit Analysis

A CDM wind farm project with VVB-confirmed additionality and a reasonable zero-leakage claim, but significant data gaps including no monitoring reports, no verified emissions reductions, and a seven-fold discrepancy between the PDD and validation report on total ERR. The project-specific baseline and absence of any post-validation monitoring data limit confidence in the credit claims.

Red Flags

  • Seven-fold discrepancy in total ERR between the PDD (603,967 tCO₂e) and the validation report (86,281 tCO₂e) raises questions about the reliability of the project's own emissions accounting
  • No monitoring reports or verified ERR figures found in any available document, leaving actual performance entirely unverified
  • Baseline method contradicts between documents: the PDD describes a jurisdictional baseline while the validation report (the authoritative VVB document) records a project-specific baseline

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, reasonable for wind

Baseline

Project-specific, no reassessment on record

Safeguards

Safeguards mentioned, FPIC and grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents