6.4/ 10
Integrity
7.0
Transparency
5.5
Claim Safety
6.5
Documentation
6.5

Audit Analysis

A 49.5 MW CDM wind project in China with a VVB-verified investment additionality test and a jurisdictional grid-emission-factor baseline. The project shows no reversal events and no corrective actions, but the leakage justification is contradictory across documents and several key verification fields (verified ERR, CORSIA/CCP status) are absent from the extracted record. Overall a moderately well-documented avoidance-type project with minor data gaps.

Red Flags

  • Leakage justification is contradictory: the validation report (Dec 2010) states leakage was 'deemed negligible' while the monitoring report (Dec 2011) records it as 'not addressed', leaving the 0% deduction without a consistent, documented rationale.
  • Total ERR verified figure is not stated in any available document, preventing independent cross-check of the 71,965 tCO₂e claimed in the monitoring report.
  • CORSIA eligibility and CCP approval status are not stated in any extracted document, leaving dual-channel risk unassessed.

Credit Vintages

IssuedRetiredAvailable
2012
71,965071,965
Total71,965071,965

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, contradictory justification

Baseline

Jurisdictional grid-EF baseline

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents