Guodian Wulian Yuli Wind Power Phase I Project

CDM-5572 ↗

#1254of 1935 in Renewable energy#740of 1084 in China#981of 1459 in CDM (UNFCCC)#974of 1287 in ACM0002

4.8/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A CDM wind power project in China validated in 2012 with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality, but the record is undermined by a seven-fold discrepancy between the PDD and validation report on total emissions reductions, eleven material findings questioning additionality rigor and legal compliance, and a complete absence of monitoring or verified-credit data. The project's core design (wind displacing grid electricity) carries low inherent leakage and reversal risk, yet the documentation gaps and data contradictions limit confidence in the credit quantity.

Red Flags

  • ERR contradiction: the PDD (May 2012) claims 596,001 tCO₂e while the validation report (May 2012) states 85,143 tCO₂e — a roughly 7× discrepancy with no documented reconciliation
  • Eleven material findings (CARs and CLs) in the validation report question the additionality analysis, legal compliance (missing Letters of Agreement), construction-date consistency, and monitoring design
  • No monitoring reports, verified ERR figures, or monitoring-period data are present in the extracted record
  • No Free, Prior and Informed Consent (FPIC) or grievance mechanism is documented despite safeguards being mentioned

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed but 11 CARs/CLs questioned the analysis

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, deemed negligible – appropriate for grid-conne

Baseline

Jurisdictional grid EF (0.895875, 2011) under ACM0002

Safeguards

Safeguards and benefit-sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents