Skip to main content
CDMWindChinaACM0002

Guodian Wuqi zhouwan 1st 49.5MW Wind Power Project

CDM-8620 ↗

#370of 1935 in Renewable energy#140of 1084 in China#238of 1459 in CDM (UNFCCC)#274of 1287 in ACM0002

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.0

Audit Analysis

A 49.5 MW onshore wind project in China registered under CDM (ACM0002 v13.0.0) with VVB-confirmed additionality via a combined test and a jurisdictional grid-emission-factor baseline. The project is a straightforward avoidance-type credit with no inherent reversal risk, but several key MRV parameters (verified ERR, FNRB, usage monitoring) are absent from the extracted record, and contradictions in the baseline-method label and leakage treatment across monitoring reports introduce moderate uncertainty.

Red Flags

  • Baseline method is labelled 'project' in the 2021 monitoring report but 'jurisdictional' in the PDD (2012); the PDD's jurisdictional characterisation is privileged as the foundational document, but the inconsistency undermines confidence in the baseline description.
  • Leakage justification is stated as 'quantified' in the 2021 monitoring report yet 'not addressed' in the 2017 monitoring report, while the deduction remains 0 % in both; the contradiction weakens the leakage narrative.
  • Verified ERR, FNRB value/method, and usage-monitoring method are all absent from the extracted record, leaving the MRV chain incomplete.
  • Ten material findings and ten corrective actions were raised during validation (missing LoAs, missing spreadsheets, insufficient PDD descriptions), all subsequently resolved, but the volume of initial gaps signals a weak first submission.

Credit Vintages

IssuedRetiredAvailable
2017
304,8270304,827
2021
266,7540266,754
Total571,5810571,581

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, inconsistent justification across reports

Baseline

Jurisdictional grid EF, but method label contradicts across

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents