Guodian Wuqi zhouwan 2nd 49.5MW Wind Power Project
#955of 1935 in Renewable energy#506of 1084 in China#695of 1459 in CDM (UNFCCC)#749of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China registered under CDM (ACM0002 v13.0.0) with a combined additionality test confirmed by VVB JCI. The project has a 0% leakage deduction justified as quantified, which is reasonable for grid-connected wind, but several key data points (verified ERR, FNRB, buffer pool, CORSIA/CCP status) are absent from the extracted record. Multiple contradictions between the PDD and monitoring reports—particularly on baseline method and ERR figures—reduce confidence in the data trail.
Red Flags
- Baseline method is contradictory: the PDD (2012) describes a jurisdictional baseline while the 2021 monitoring report characterises it as project-specific, creating ambiguity about the reference case.
- Total ERR claimed differs between the 2017 monitoring report (342,284 tCO₂e) and the 2021 monitoring report (287,865 tCO₂e); although the two reports likely cover different sub-periods, both are labelled as lifetime totals, making the true cumulative figure unclear.
- No buffer pool percentage or permanence mechanism is stated in any available document, leaving reversal risk unquantified despite the 7-year crediting period.
- Thirteen material findings and thirteen corrective actions were raised at validation, all documentation-related, indicating the initial PDD submission was substantially incomplete.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 342,282 | 0 | 342,282 | |
| 2021 | 287,865 | 0 | 287,865 | |
| Total | 630,147 | 0 | 630,147 |
Risk Indicators
Combined test, VVB-confirmed
avoidance project
0% quantified, justified for wind-to-grid
Method contradictory (project vs jurisdictional)
Safeguards mentioned; FPIC/grievance not detailed
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →