Skip to main content
CDMWindChinaACM0002

Guodian Youyu Gaojiapu Phase III 49.5MW Windfarm Project

CDM-8604 ↗

#622of 1084 in China#843of 1459 in CDM (UNFCCC)#864of 1287 in ACM0002

5.0/ 10
Integrity
6.0
Transparency
3.0
Claim Safety
6.5
Documentation
3.5

Audit Analysis

A 49.5 MW onshore wind project in China registered under CDM with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality. The project's fundamentals are sound for a wind avoidance project, but the available record contains no monitoring reports, no verified emission reductions, and a low extraction confidence rating, leaving performance unverified. Five corrective action requests during validation and a minor contradiction on leakage treatment introduce moderate data-reliability concerns.

Red Flags

  • No monitoring reports or verified emission-reduction figures are present in the extracted record; the 589,799 tCO2e lifetime claim is unverified against actual performance.
  • Five Corrective Action Requests were raised and closed during validation, and a corrective action to revise the PDD based on expert opinions was required, indicating initial documentation weaknesses.
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable, reducing reliability of the extracted data.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible; PDD/validation contradiction

Baseline

Jurisdictional grid EF (2011)

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents