Guodian Youyu Laoqianshan Wind Farm Phase I 49.5MW Project
#142of 1935 in Renewable energy#39of 1084 in China#85of 1459 in CDM (UNFCCC)#101of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China registered under CDM with a VVB-confirmed investment additionality test and a jurisdictional grid-emission-factor baseline. The first monitoring period shows roughly five times the pro-rata ex-ante expectation, suggesting a conservative initial estimate, but several contradictions between the validation and monitoring reports (baseline method, crediting-period dates, leakage treatment) and the absence of a verification report or later monitoring data limit confidence in the full crediting-period record.
Red Flags
- The monitoring report records 38,875 tCO₂e for the first ~7.5 months while the validation report's ex-ante lifetime estimate is 87,720 tCO₂e over 7 years — a ~5× pro-rata over-delivery that, while conservative, warrants explanation of the ex-ante capacity-factor assumption.
- Five contradictions between the validation report and the monitoring report (leakage justification, additionality test type, ERR figure, baseline method, crediting-period dates) indicate inconsistent documentation across the project record.
- Only one monitoring period (May–Dec 2011) is available for a 7-year crediting period; no verification report or subsequent monitoring reports were found in the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 38,875 | 0 | 38,875 | |
| Total | 38,875 | 0 | 38,875 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Deemed negligible, appropriate for grid wind
Jurisdictional grid EF, 2008 vintage, method contradiction
Safeguards mentioned; FPIC and grievance mechanism not state
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →