Guohua Chenbaerhu Qi Phase I 49.5MW Wind Farm Project
#1315of 1935 in Renewable energy#793of 1084 in China#1041of 1459 in CDM (UNFCCC)#1019of 1287 in ACM0002
Audit Analysis
A 49.5 MW CDM wind farm in China with VVB-confirmed additionality and a standard grid-emission-factor baseline, but the project delivered only about 17% of its pro-rata expected emissions reductions in the first monitoring period, raising significant over-crediting concerns. Four inter-document contradictions (leakage justification, ERR figures, baseline method, crediting period) and 14 material findings—including missing DNA approval letters—undermine confidence in the project's data integrity.
Red Flags
- Verified ERR of 45,270 tCO₂e for the first monitoring period is only ~17% of the pro-rata expectation (~262,000 tCO₂e) derived from the PDD's lifetime claim of 831,454 tCO₂e over 7 years, indicating a major under-delivery or over-crediting risk.
- Four contradictions between the PDD, validation report, and monitoring report (leakage justification, ERR figures, baseline method, crediting period) suggest document management or data reliability issues.
- 14 material findings in the verification report, including missing Letters of Approval from both China's and Sweden's DNAs, and the requirement to remove CDM projects from the common-practice analysis, indicate unresolved compliance gaps.
- Grid emission factor of 1.1461 tCO₂/MWh is based on 2006 data, which is dated and may overstate the baseline if the grid has decarbonised since then.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 45,209 | 0 | 45,209 | |
| Total | 45,209 | 0 | 45,209 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversals reported
0% deduction, contradictory justification across docs
Grid EF 2006, method label contradicts between docs
Safeguards & benefit sharing mentioned; FPIC and grievance m
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →