Guohua Chenbaerhu Qi Phase I 49.5MW Wind Farm Project

CDM-2472 ↗

#1315of 1935 in Renewable energy#793of 1084 in China#1041of 1459 in CDM (UNFCCC)#1019of 1287 in ACM0002

4.7/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
4.0
Documentation
4.5

Audit Analysis

A 49.5 MW CDM wind farm in China with VVB-confirmed additionality and a standard grid-emission-factor baseline, but the project delivered only about 17% of its pro-rata expected emissions reductions in the first monitoring period, raising significant over-crediting concerns. Four inter-document contradictions (leakage justification, ERR figures, baseline method, crediting period) and 14 material findings—including missing DNA approval letters—undermine confidence in the project's data integrity.

Red Flags

  • Verified ERR of 45,270 tCO₂e for the first monitoring period is only ~17% of the pro-rata expectation (~262,000 tCO₂e) derived from the PDD's lifetime claim of 831,454 tCO₂e over 7 years, indicating a major under-delivery or over-crediting risk.
  • Four contradictions between the PDD, validation report, and monitoring report (leakage justification, ERR figures, baseline method, crediting period) suggest document management or data reliability issues.
  • 14 material findings in the verification report, including missing Letters of Approval from both China's and Sweden's DNAs, and the requirement to remove CDM projects from the common-practice analysis, indicate unresolved compliance gaps.
  • Grid emission factor of 1.1461 tCO₂/MWh is based on 2006 data, which is dated and may overstate the baseline if the grid has decarbonised since then.

Credit Vintages

IssuedRetiredAvailable
2014
45,209045,209
Total45,209045,209

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversals reported

Leakage

0% deduction, contradictory justification across docs

Baseline

Grid EF 2006, method label contradicts between docs

Safeguards

Safeguards & benefit sharing mentioned; FPIC and grievance m

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents