Skip to main content
CDMWindChinaACM0002

Guohua Chicheng Dushikou West Wind Farm Project

CDM-4277 ↗

#257of 1935 in Renewable energy#91of 1084 in China#160of 1459 in CDM (UNFCCC)#187of 1287 in ACM0002

6.2/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.5
Documentation
6.0

Audit Analysis

A standard CDM wind farm project in China using the well-established ACM0002 methodology, with a VVB-confirmed investment additionality test and a jurisdictional grid-emission-factor baseline. The project shows no reversal risk (inherent to wind displacement of grid electricity) and a defensible 0% leakage deduction, but documentation gaps on safeguards, grievance mechanisms, and verified emission-reduction figures limit confidence. Several inter-document contradictions exist but are largely explainable by differing time bases or document roles.

Red Flags

  • No FPIC or grievance mechanism is recorded in any available document, creating a safeguards gap
  • The verified emission-reduction figure for the monitoring period is absent from the extracted record, preventing independent cross-check of the claimed 721,987 tCO2e lifetime estimate
  • Grid emission factor is fixed at the 2007 value (0.9502) with no evidence of periodic update or sensitivity analysis beyond the one corrective action noted

Credit Vintages

IssuedRetiredAvailable
2012
26,444026,444
2014
160,9320160,932
Total187,3760187,376

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, deemed negligible (wind)

Baseline

Jurisdictional grid EF (0.9502, 2007)

Safeguards

Mentioned but FPIC and grievance mechanism not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents