Guohua Chicheng Mayinggushan Wind Farm Project
#956of 1935 in Renewable energy#507of 1084 in China#696of 1459 in CDM (UNFCCC)#750of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with a VVB-confirmed investment additionality test and a standard grid-emission-factor baseline, but undermined by a seven-fold discrepancy in claimed emission reductions between the PDD and the validation report, multiple unreported monitoring parameters, and only a single six-month monitoring period available. The project's inherent low reversal risk as a wind installation is a positive, yet the data inconsistencies and documentation gaps limit confidence in the credit volume.
Red Flags
- Total ERR claimed differs by a factor of seven between the PDD (703,731 tCO₂e) and the validation report (100,533 tCO₂e), raising serious questions about which figure is authoritative
- Baseline method is described as 'project' in the monitoring report but 'jurisdictional' in the validation report, creating ambiguity about the baseline construction
- Verified ERR for the monitoring period is not stated in the available monitoring report, preventing any pro-rata delivery check
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 16,448 | 0 | 16,448 | |
| Total | 16,448 | 0 | 16,448 |
Risk Indicators
Investment test VVB-confirmed
Wind – low inherent reversal risk
0% quantified, plausible for wind
Grid EF standard but method label contradicted
Safeguards mentioned; FPIC and grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →