Guohua Dalaidong 49.5MW Wind Farm Project in Hulunbeier City
#552of 1935 in Renewable energy#254of 1084 in China#372of 1459 in CDM (UNFCCC)#422of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in Hulunbeier, China, validated under CDM methodology ACM0002 with a combined additionality test confirmed by ERM. The project design is sound for a wind displacement project, but the available record contains only the validation report with no monitoring or verification data, limiting the ability to assess actual delivery. Several key parameters (FNRB, usage rate, monitoring period) are absent from the extracted record.
Red Flags
- No monitoring or verification reports are present in the extracted record; actual credit issuance and delivery cannot be independently confirmed.
- The PDD states a total emission reduction of 797,972 tCO2e while the validation report states 113,996 tCO2e; although this is consistent with an annual-versus-total basis (113,996 × 7 = 797,972), the discrepancy was flagged as a CAR and warrants confirmation that the registry-issued figure matches the VVB-verified annual value.
- FNRB value and method are not stated in any available document, leaving the baseline emission factor derivation partially opaque.
- Grid emission factor differs between the validation report (0.96358) and an appendix (1.085); the validation report value is privileged but the source of the higher appendix figure is unexplained.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Wind displacement, no reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional grid EF, standard for ACM0002
Safeguards mentioned, FPIC and grievance not detailed
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →