Guohua Dongying Guangrao Wind Farm Second Phase Project

CDM-6482 ↗

#553of 1935 in Renewable energy#255of 1084 in China#373of 1459 in CDM (UNFCCC)#423of 1287 in ACM0002

5.7/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A CDM wind farm project with VVB-confirmed additionality and a jurisdictional baseline, but significant gaps in verified emissions data, monitoring records, and a large discrepancy between the PDD and validation report ERR figures. The project is a straightforward renewable energy generation activity with low inherent risk, yet the documentation record is thin and extraction confidence is low.

Red Flags

  • ERR figures differ by a factor of ~7 between the PDD (632,947 tCO2e) and the validation report (90,421 tCO2e); the validation report figure is privileged as the VVB's independent assessment, but the magnitude of the gap warrants scrutiny
  • No verified ERR figure, monitoring period, or monitoring report is present in the extracted record, making it impossible to confirm actual delivery against the validated claim
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in the completeness of the evidence base

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Wind generation – no storage/reversal risk

Leakage

0% deduction, deemed negligible (appropriate for wind)

Baseline

Jurisdictional baseline, reassessed 2012

Safeguards

Mentioned but FPIC and grievance mechanism not detailed

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents