Guohua Dongying Hekou 49.5 MW Wind Farm Project (Phase 1)
#852of 1935 in Renewable energy#440of 1084 in China#603of 1459 in CDM (UNFCCC)#665of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind farm in China under CDM methodology ACM0002, with a jurisdictional baseline and a 7-year crediting period (2016–2023). The project is inherently low-risk in terms of permanence and leakage, but the extracted record shows significant documentation gaps—additionality test type, monitoring period, and several MRV parameters are not stated. A minor material finding regarding a tool version mismatch was noted but required no corrective action.
Red Flags
- Additionality test type and VVB confirmation of additionality are not stated in the extracted record, leaving a gap in the additionality evidence chain
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in the completeness of the data
- No monitoring reports are explicitly identified among the evidence documents; only the PDD, validation report, and issuance record are listed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 96,547 | 0 | 96,547 | |
| 2013 | 280,557 | 0 | 280,557 | |
| Total | 377,104 | 0 | 377,104 |
Risk Indicators
Test type not stated in record
Wind avoidance – no reversal risk
0% – standard for wind displacement
Jurisdictional, reassessed at project start
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →