Guohua Dongying Hekou Wind Farm Phase V Project
#1022of 1935 in Renewable energy#564of 1084 in China#757of 1459 in CDM (UNFCCC)#805of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in China with a confirmed combined additionality test and a jurisdictional grid-emission-factor baseline, but the available record is limited to a single validation report with no monitoring or verification data. The apparent discrepancy in ER figures between the PDD and validation report resolves to an annual-versus-lifetime reporting difference rather than a true contradiction. Overall, the project design is sound for a wind avoidance project, but the absence of post-validation monitoring data and low extraction confidence significantly limit the assessment.
Red Flags
- No monitoring or verification reports found in the extracted record; the project's actual performance over its 2013–2020 crediting period is entirely unverified in the available data
- Minimum extraction confidence is rated low, and one of the seven source documents is listed as 'unknown', reducing reliability of the extracted facts
- Grid emission factor is from 2011 while the crediting period began in April 2013, introducing a small temporal mismatch in the baseline
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% deemed negligible, reasonable for wind
Jurisdictional, grid EF from 2011 for 2013 start
Safeguards and benefit sharing mentioned; FPIC and grievance
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →