Audit Analysis
A CDM wind farm project with a VVB-confirmed combined additionality test and a jurisdictional grid-based baseline, but the available record is limited to pre-crediting validation documents with no monitoring or verification data. The apparent discrepancy in claimed ERs (96,139 vs 672,973 tCO2e) resolves as an annual-versus-lifetime reporting difference, and the three corrective actions were minor administrative items. Low extraction confidence and the absence of any post-validation monitoring data significantly limit the depth of assessment.
Red Flags
- No monitoring reports or verification reports found in the extracted record; all available documents predate the crediting period (2013–2020)
- Minimum extraction confidence rated low, and one evidence document is listed as 'unknown', reducing reliability of the extracted data
- Grid emission factor sourced from 2011 data for a project whose crediting period began in April 2013; no baseline reassessment date is recorded
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
avoidance project
0% deemed negligible, reasonable for wind
Jurisdictional grid EF from 2011; no reassessment data
Mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →