Guohua Guangrao Wind Farm Project (phase I)
#258of 1935 in Renewable energy#92of 1084 in China#161of 1459 in CDM (UNFCCC)#188of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in China with VVB-confirmed combined additionality and a jurisdictional grid-emission-factor baseline. The project over-delivered relative to its ex-ante estimate during the first monitoring period, and no reversal or leakage concerns are evident for this technology. However, contradictions between the PDD, validation report, and monitoring report on baseline method and leakage justification, combined with absent safeguards documentation (no FPIC, no grievance mechanism), moderate the overall assessment.
Red Flags
- Baseline method is characterised as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report — the VVB's jurisdictional characterisation is privileged, but the inconsistency undermines confidence in the baseline documentation.
- Leakage justification shifts from 'deemed negligible' (validation report, 2012) to 'quantified' (monitoring report, 2014) while the deduction remains 0%; the quantification basis is not transparently documented.
- No FPIC, grievance mechanism, or benefit-sharing detail beyond a boolean flag is found in the extracted record, leaving social-safeguard compliance unverified.
- Crediting period end date is not stated in any available document, making the full lifetime of the project uncertain.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 98,689 | 0 | 98,689 | |
| Total | 98,689 | 0 | 98,689 |
Risk Indicators
VVB-confirmed combined test
Wind avoidance, no reversal risk
0% deduction, quantified as negligible
Grid EF used, but method label contradicts across docs
Mentioned but no FPIC or grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →