Guohua Guyuan Pandaogou Wind Farm Project

CDM-5853 ↗

#113of 1935 in Renewable energy#28of 1084 in China#65of 1459 in CDM (UNFCCC)#80of 1287 in ACM0002

6.6/ 10
Integrity
7.0
Transparency
6.0
Claim Safety
6.5
Documentation
7.0

Audit Analysis

A CDM wind farm project in China with a VVB-confirmed investment additionality test, a standard grid-emission-factor baseline, and no inherent permanence risk. Six minor corrective actions (typos, outdated tool version, initially missing letters of agreement) were all resolved, and no material compliance issues remain. Several transparency fields (verified ERR, FNRB, usage monitoring) are absent from the extracted record, and contradictions between the PDD, validation report, and monitoring report on baseline characterisation and leakage justification warrant caution.

Red Flags

  • Baseline method is characterised as 'project' in the monitoring report but 'jurisdictional' in the PDD — the PDD/validation-report interpretation (jurisdictional grid baseline) is consistent with ACM0002 and is privileged, but the inconsistency reduces confidence in data quality.
  • Leakage justification is stated as 'quantified' in the monitoring report (2013) but 'deemed negligible' in the validation report (2012); the 0% deduction is reasonable for a grid-connected wind project, yet the inconsistent language across documents is a documentation weakness.
  • Total ERR verified for the monitoring period is not stated in the extracted record; only the claimed figure of 38,278 tCO₂e (monitoring report) and the lifetime ex-ante estimate of 100,008 tCO₂e (validation report) are available, preventing an independent cross-check.
  • Grid emission factor is from 2010 (0.9309 tCO₂/MWh); no evidence of a more recent or updated factor was found in the available documents.

Credit Vintages

IssuedRetiredAvailable
2013
38,278038,278
Total38,278038,278

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justified for grid-connected wind

Baseline

Grid EF 2010; method label inconsistent across docs

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents