Guohua Guyuan Xiaoerhao Wind Farm Project
#499of 1935 in Renewable energy#206of 1084 in China#326of 1459 in CDM (UNFCCC)#374of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China with a confirmed investment-test additionality and a jurisdictional grid-emission-factor baseline, but undermined by four corrective actions at validation (incorrect grid-EF vintage, inconsistent benchmark values, formula errors) and a notable discrepancy in the claimed ERR between the PDD and validation report. The project type (wind, avoidance) carries low permanence risk, and leakage is quantified at 0% with justification, but several key MRV and safeguards fields are absent from the extracted record.
Red Flags
- Four corrective actions were required at validation, including an incorrect data vintage for the grid emission factor and formula errors in the PDD, indicating the initial documentation contained material errors.
- The claimed ERR differs by a factor of ~7 between the PDD (710,521 tCO₂e) and the validation report (101,503 tCO₂e); while this is likely a lifetime-vs-annual mismatch, the inconsistency was not explicitly reconciled in the documents.
- Baseline method is described as 'project' in the monitoring report but 'jurisdictional' in the validation report, creating ambiguity about the actual baseline approach.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 58,165 | 0 | 58,165 | |
| Total | 58,165 | 0 | 58,165 |
Risk Indicators
Investment test confirmed by ERM
Avoidance project, no reversal risk
0% quantified, justified for grid displacement
Jurisdictional grid EF, but CAR on vintage; method label inc
Safeguards mentioned but FPIC and grievance mechanism not do
CDM registry; CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →