Guohua Guyuan Xiyingzi 49.5MW Wind Farm Project
#1493of 1935 in Renewable energy#931of 1084 in China#1246of 1459 in CDM (UNFCCC)#1138of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China validated under CDM with a combined additionality test confirmed by ERM CVS, but the available record is heavily skewed toward the 2012 validation stage with no monitoring data. A seven-fold discrepancy between the PDD and validation report on lifetime emissions raises serious data-reliability questions, and the absence of buffer-pool, FN/RB, and monitoring details leaves key integrity and transparency gaps unaddressed.
Red Flags
- Seven-fold discrepancy in lifetime ERR: the PDD (Sep 2012) states 745,962 tCO₂ while the validation report (Oct 2012) states 106,566 tCO₂; the validated figure is roughly one year's expected output for a 49.5 MW turbine, suggesting a possible unit or period error in one of the two documents.
- Three Corrective Action Requests (CARs) and one Comment (CL) were raised in the validation report regarding additionality tool version, common-practice analysis, and policy description, yet the corrective-actions list in the merged record is empty, creating ambiguity about whether these were resolved.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but tool-version CARs raised
mixed evidence / unresolved risk
0% deduction, negligible justification consistent with wind
Jurisdictional grid EF (2009) but no reassessment data
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →