Guohua Hebei Huanghua (Phase II) 49.5MW Windfarm Project

CDM-3021 ↗

#4of 1084 in China#21of 1459 in CDM (UNFCCC)#19of 1287 in ACM0002

7.0/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.5
Documentation
7.0

Audit Analysis

A 49.5 MW onshore wind project in China registered under CDM with a combined additionality test confirmed by SGS United Kingdom Ltd. The project delivers credits at approximately 98% of the pro-rata expectation for the elapsed monitoring period, with a standard jurisdictional grid-emission-factor baseline and a justified zero leakage deduction. Minor administrative contradictions between the monitoring report and verification report do not materially affect credit integrity.

Red Flags

  • Baseline method described as 'jurisdictional' in the verification report but 'project' in the monitoring report — the VVB's characterisation is privileged, but the inconsistency warrants attention
  • Crediting period differs between the PDD (2010-01-01 to 2016-12-31) and the verification report (2010-05-14 to 2017-05-13); the verification report value is privileged as more recent and reflecting the registered period
  • Grid emission factor is from 2007; no evidence of periodic grid-EF updates within the crediting period was found in the extracted record

Credit Vintages

IssuedRetiredAvailable
2011
100,2800100,280
2013
170,3100170,310
Total270,5900270,590

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% justified for wind

Baseline

Jurisdictional grid-EF, standard method

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CCP/CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents