Skip to main content
CDMWindChinaACM0002

Guohua Hulunbeier Xinbaerhu Youqi 49.5MW Wind Farm Project

CDM-0981 ↗

#1526of 1935 in Renewable energy#965of 1084 in China#1306of 1459 in CDM (UNFCCC)#1163of 1287 in ACM0002

4.2/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A 49.5 MW CDM wind farm in China's Hulunbeier region with a jurisdictional baseline and a high grid emission factor (0.9869 tCO₂/MWh), validated by Bureau Veritas with no material findings. However, the extracted record lacks additionality test details, monitoring data, and verified emission reduction figures, and the low extraction confidence limits assurance. The project is a straightforward avoidance-type wind credit with low inherent permanence risk, but documentation gaps prevent a higher confidence rating.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the extracted record, creating uncertainty about whether the investment or regulatory hurdle test was rigorously applied
  • No monitoring report or verification report is present in the evidence set; total verified ERR is not available, so actual delivery against the 794,451 tCO₂e lifetime claim cannot be assessed
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines reliability of all extracted facts

Credit Vintages

IssuedRetiredAvailable
2008
46,146046,146
2009
55,983055,983
2011
225,7650225,765
2012
161,4930161,493
2013
41,517041,517
Total530,9040530,904

Risk Indicators

Additionality

Test type not stated in record

Permanence

Avoidance project, no reversal risk

Leakage

Deemed negligible, consistent with wind

Baseline

Jurisdictional, 2014 grid EF

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CCP and CORSIA status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents