Guohua Hulunbeier Xinbaerhuzuoqi Bayanchagan 49.5MW Wind Farm Project
#1317of 1935 in Renewable energy#795of 1084 in China#1043of 1459 in CDM (UNFCCC)#1021of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China validated under CDM with a confirmed investment additionality test and a standard jurisdictional grid baseline. However, a seven-fold discrepancy between the PDD's claimed emissions reductions (813,659 tCO₂e) and the validation report's figure (116,237 tCO₂e) raises serious questions about the reliability of the quantification, and no verified monitoring results are available in the extracted record.
Red Flags
- Seven-fold discrepancy in total emissions reductions: the PDD states 813,659 tCO₂e while the validation report states 116,237 tCO₂e — a ratio of approximately 7:1 that cannot be reconciled from the available documents
- No verified monitoring-period emissions reductions are available in the extracted record, making it impossible to confirm actual delivery against any claimed figure
- The validation report's figure of 116,237 tCO₂e over seven years implies a wind-farm capacity factor of roughly 4%, which is far below the typical 25–45% range and may indicate a data-extraction or reporting error
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, physically justified for wind
Jurisdictional grid EF, standard for CDM wind
Safeguards mentioned, FPIC and grievance mechanism not state
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →