Guohua Inner Mongolia Huitengliang West Wind Farm Project
#959of 1935 in Renewable energy#510of 1084 in China#699of 1459 in CDM (UNFCCC)#753of 1287 in ACM0002
Audit Analysis
A standard CDM wind farm project in Inner Mongolia with a jurisdictional baseline and appropriate leakage treatment for grid-connected wind. The project delivered exactly 100% of its pro-rata expected emissions reductions for the first monitoring period, but key additionality details and several MRV parameters are absent from the extracted record, limiting confidence in the full compliance picture.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, creating an evidence gap on a core CDM requirement
- The PDD lifetime ERR estimate (792,757 tCO₂e) and the validation report figure (113,251 tCO₂e) differ by a factor of 7, which is consistent with a 7-year crediting period but should be explicitly reconciled in project documentation
- CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 60,953 | 0 | 60,953 | |
| 2010 | 71,746 | 0 | 71,746 | |
| 2011 | 54,423 | 0 | 54,423 | |
| 2013 | 57,114 | 0 | 57,114 | |
| 2014 | 139,696 | 0 | 139,696 | |
| Total | 383,932 | 0 | 383,932 |
Risk Indicators
Test type not stated in extracted record
Avoidance project, no reversal events
0% deemed negligible, appropriate for wind
Jurisdictional, reassessed 2017
Mentioned and benefit sharing described, FPIC/grievance not
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →