4.4/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A CDM wind farm project in Inner Mongolia with a jurisdictional baseline and a 7-year crediting period (2014–2021), claiming 792,680 tCO₂e. The project is inherently low-risk in terms of permanence (wind displaces grid electricity with no reversal mechanism), but the extracted record contains significant gaps: no monitoring or verification reports, no verified ERR figure, and no explicit additionality test type. Two minor material findings (PDD version and monitoring plan content) were flagged at validation and required corrective actions.

Red Flags

  • No monitoring or verification reports found in the extracted record; total ERR verified is not stated, making it impossible to confirm actual delivery against the 792,680 tCO₂e claim
  • Additionality test type and VVB confirmation are not stated in the available documents, leaving the additionality assessment unverified in the extracted data
  • Two material findings at validation (CAR01: revised monitoring plan not addressed; CL01: PDD version not adopted) required corrective actions, indicating documentation quality issues at project inception

Credit Vintages

IssuedRetiredAvailable
2009
39,989039,989
2010
120,8210120,821
2011
87,594087,594
2012
79,669079,669
2013
93,135093,135
Total421,2080421,208

Risk Indicators

Additionality

Test type not stated in extracted record

Permanence

Wind displacement — no reversal mechanism

Leakage

0% deduction, reasonable for grid-displacement wind

Baseline

Jurisdictional baseline, grid EF 0.917 (2014)

Safeguards

FPIC and safeguards mentioned; grievance mechanism not detai

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents