Guohua Inner Mongolia Suniteyouqi Phase I Wind Farm Project
#1111of 1935 in Renewable energy#624of 1084 in China#845of 1459 in CDM (UNFCCC)#866of 1287 in ACM0002
Audit Analysis
A 50 MW wind farm in Inner Mongolia registered under CDM with VVB-confirmed additionality and a reasonable grid emission factor, but the project is undermined by a significant discrepancy between the ex-ante ERR estimate (107,857 tCO₂ in the validation report) and the monitoring-period figure (168,028 tCO₂ in the monitoring report), a contradiction in baseline methodology classification, and a 2014 monitoring report that leaves a large gap before the 2019 end of the crediting period.
Red Flags
- ERR figures differ by ~56% between the validation report (107,857 tCO₂) and the monitoring report (168,028 tCO₂); if the monitoring figure covers only ~17.5 months while the validation figure covers the full 7-year crediting period, the project is delivering roughly 7× the ex-ante expectation, raising over-crediting concerns
- Baseline method is classified as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report — a fundamental methodological inconsistency that affects the validity of the credit calculation
- No verified ERR figure (total_err_verified) was found in any available document, leaving the actual credit issuance unconfirmed
- The only monitoring report on file covers 2012-11 to 2014-04, leaving approximately 5.5 years of the 7-year crediting period (ending 2019-10) without documented monitoring
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 167,922 | 0 | 167,922 | |
| Total | 167,922 | 0 | 167,922 |
Risk Indicators
VVB-confirmed combined test
Avoidance-type, no reversals
0% deduction, quantified (wind)
Method contradicted across docs
Mentioned but not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →