Guohua Lijin (Phase III) Wind Farm Project
#960of 1935 in Renewable energy#511of 1084 in China#700of 1459 in CDM (UNFCCC)#754of 1287 in ACM0002
Audit Analysis
A 50 MW onshore wind project in China validated under CDM methodology ACM0002 with a confirmed combined additionality test and a jurisdictional grid-emission-factor baseline. The project is inherently low-risk in terms of permanence and leakage, but the available record contains no verified monitoring data, a significant discrepancy between the PDD and validation-report ERR figures, seven corrective-action requests at validation, and a low extraction-confidence flag that limits confidence in the extracted evidence.
Red Flags
- The PDD reports a lifetime ERR of 681,548 tCO₂e while the validation report (same date, 2012-12-28) states 96,546 tCO₂e — a roughly 7× gap that is likely an annual-vs-lifetime labelling error but indicates a documentation inconsistency that was not explicitly reconciled in the record.
- No verified monitoring-period ERR figure is available in the extracted record, so actual performance against the ex-ante estimate cannot be assessed.
- Seven corrective-action requests were raised at validation, including corrections to the PLF/investment analysis and missing measurement-interval specifications, suggesting the initial submission had material gaps.
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the completeness of the evidence base is uncertain.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test confirmed by VVB
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional grid EF (0.9309, 2010)
Mentioned but FPIC and grievance details absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →