Guohua Rongcheng Phase III Wind Farm Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, and the verification report reports no material findings.
missing Leakage is not addressed in the verification record, and no buffer pool or reversal history is stated in the available documents.
Transparency
verified The project has a named VVB and a defined monitoring period in the verification report, which supports basic traceability.
missing The extracted record shows a large gap between claimed and verified emission reductions, and several monitoring details such as leakage treatment and usage monitoring are not stated.
Claim Safety
verified The project is marked as not CORSIA-eligible, which reduces dual-market claim risk.
missing The verified emission reductions of 233,209 are much lower than the 361,920 figure in a later document, and the baseline is project-specific rather than a recently reassessed standardized baseline.
Documentation
verified The record includes a substantial number of extracted documents and a recent verification report dated 2022-12-20.
missing Extraction confidence is low, and the verification report lists several corrective actions, including requests for an LoA, MoC, and clarification of common practice analysis.
Detailed Analysis
Integrity
The verification report from China Certification Center, Inc. confirms additionality through an investment test and reports no material findings, which supports the project’s core integrity. At the same time, leakage is marked as not addressed, and no buffer pool or reversal-event information is available, so permanence and leakage controls are weakly evidenced. The project uses ACM0002 methodology version 12.3.0, but the baseline is project-specific and not shown to have been recently reassessed.
Transparency
The project has a named verifier and a clear monitoring period in the 2022-12-20 verification report, which helps traceability. However, several key monitoring fields are not stated in the extracted record, including leakage quantification and usage monitoring method, and the extraction confidence is low. The large discrepancy between claimed and verified emission reductions also reduces confidence in the completeness of the public record.
Claim Safety
Claim safety is weakened by the mismatch between 233,209 verified emission reductions and 361,920 claimed in another document, which suggests a material over-crediting or reporting inconsistency risk. The project is not CORSIA-eligible, which helps on dual-claim exposure, but CCP status is not stated. Because the baseline is project-specific and leakage is not addressed, the overall claim-safety profile remains moderate to weak.
Documentation
The record draws on 23 documents, and the verification report is recent, but the extraction confidence is low, indicating at least one key source was hard to read. The verification report also lists corrective actions, including requests for an LoA, a Modality of Communication, and clarification of common practice analysis, which suggests documentation gaps. The crediting period is long and the monitoring period is later, but the available evidence still leaves important fields unstated.
Overall
Overall, this is a mid-quality project with some solid integrity evidence but meaningful documentation and accounting weaknesses. I privileged the 2022-12-20 verification report over older material where facts conflicted, because it is the more recent verification source; for the contradictory emission-reduction figures, I treated the verified 233,209 as the more reliable value because it comes from the verification report, while the higher 361,920 figure appears in a different later document without the same verification status. I also privileged the newer safeguard statements over older ones, but the contradictions themselves still lower confidence and the score.
Audit Analysis
This wind project has some positive integrity signals, including VVB-confirmed additionality and no reported material findings in the verification report. However, key safeguards and accounting details are incomplete or inconsistent, and the verified emission reductions are materially lower than the amount claimed, which raises over-crediting concerns.
Project Description
Proponent: Guohua Resourceful (Rongcheng) Wind Power Generation Co., Ltd. Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 89823 tCO2e Region: Asia Registration date: 2020-06-04
Red Flags
- Verified emission reductions were 233,209, far below the 361,920 figure reported in another document, indicating a major discrepancy in credited volume.
- Leakage treatment is not addressed in the available verification record, and no buffer pool or reversal protection details were found.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 97,431 | 97,431 | 0 | |
| 2011 | 55,373 | 55,373 | 0 | |
| Total | 152,804 | 152,804 | 0 |
Cosa migliorerebbe questo punteggio
- Provide a complete leakage assessment, including any quantified deduction or a clear justification for why leakage is negligible.
- Resolve the emission-reduction discrepancy by publishing a reconciled statement explaining the difference between claimed and verified volumes, with document references.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal evidence, but buffer not stated
Leakage not addressed
Project baseline, reassessment not stated
FPIC and grievance mechanism documented
Not CORSIA-eligible
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
issuance
monitoring
Other
pdd
validation
- VALID_STA_1304_30MAY2014.PDF
- VCS-Verification-Representation - 1304 2018-2-1 to 2020-10-16-signed.pdf
- VCS RCP Validation-Report_Rongcheng III_ID1304.pdf
- VCS-Verification-Report - 1304 2014-2-1 to 2018-1-31.pdf
- VERIF_STA_1304_17OCT2010_18JUL2012.PDF
- VCS-Verification-Representation - 1304 2014-2-1 to 2018-1-31.pdf
- +4 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →