Guohua Rongcheng Phase III Wind Farm Project
#900of 1935 in Renewable energy#474of 1084 in China#625of 1459 in CDM (UNFCCC)#708of 1287 in ACM0002
Audit Analysis
A CDM wind project in China with VVB-confirmed additionality and a pro-rata delivery rate of approximately 99% of the ex-ante expectation, but undermined by five material findings in the monitoring report, a contradiction in baseline method classification between the validation and monitoring reports, and inconsistent leakage treatment. The project is a low-reversal-risk avoidance activity, yet procedural gaps and data inconsistencies limit confidence in the overall credit quality.
Red Flags
- Five material findings (CARs) in the monitoring report, including non-compliant data vintage for the emission factor calculation and an insufficient common practice analysis, directly undermining baseline and additionality robustness
- Baseline method is classified as 'project' in the monitoring report (2014) but 'jurisdictional' in the validation report (2012) — an unresolved contradiction that affects the validity of the reference scenario
- Leakage justification is contradictory: the validation report (2012) states leakage was 'deemed negligible' while the monitoring report (2014) records it as 'not addressed', with a 0% deduction applied in both cases
- Total verified ERR is not stated in the extracted record, preventing independent confirmation of the claimed 133,851 tCO₂e for the monitoring period
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 133,851 | 0 | 133,851 | |
| Total | 133,851 | 0 | 133,851 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, inconsistent justification
Method contradiction across documents
Mentioned but FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →