Guohua Rongcheng Phase V Wind Farm Project
#1024of 1935 in Renewable energy#566of 1084 in China#759of 1459 in CDM (UNFCCC)#807of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with a well-established additionality case (combined test verified by SGS) and an appropriate jurisdictional grid-emission-factor baseline. However, the available record is limited to the validation report and PDD, with no verification or monitoring reports, low extraction confidence, and no verified emission-reduction figures to confirm the 596,988 tCO₂e lifetime claim. The project is inherently low-risk for wind, but the documentation gaps prevent a higher confidence assessment.
Red Flags
- No verification reports or monitoring reports found in the extracted record; the 596,988 tCO₂e lifetime claim cannot be cross-checked against verified figures
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of all extracted facts
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Avoidance tech, no reversal risk
0% deemed negligible, appropriate
Jurisdictional grid EF (2011)
Mentioned but details sparse
CORSIA/CCP status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →