Guohua Shangyi Beishileng Phase I Wind Farm Project
#144of 1935 in Renewable energy#41of 1084 in China#87of 1459 in CDM (UNFCCC)#103of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China with VVB-confirmed additionality (combined test) and no inherent reversal risk, but hampered by contradictory baseline and leakage characterisations across documents and a missing verified ERR figure. The project is fundamentally low-risk in design (grid-displacement wind generation) yet the documentation gaps and internal inconsistencies prevent a higher confidence rating.
Red Flags
- Baseline method is described as 'project-specific' in the monitoring report (2014) but 'jurisdictional' in the validation report (2012) — an unresolved contradiction that affects the credibility of the emissions baseline
- Leakage justification is inconsistent: the monitoring report (2014) states leakage was 'quantified' while the validation report (2012) states it was 'deemed negligible', yet both apply a 0% deduction
- No verified ERR figure is available in the extracted record, preventing an independent check of claimed versus delivered credits
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 94,075 | 0 | 94,075 | |
| Total | 94,075 | 0 | 94,075 |
Risk Indicators
VVB-confirmed combined test
Wind generation, no reversal risk
0% deduction, conflicting justification
Project vs jurisdictional contradiction
Mentioned but FPIC/grievance unstated
CORSIA and CCP status unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →