Guohua Wulate Houqi Saiwusu Phase I Wind Farm Project

CDM-5724 ↗

#308of 1935 in Renewable energy#114of 1084 in China#198of 1459 in CDM (UNFCCC)#229of 1287 in ACM0002

6.1/ 10
Integrity
7.0
Transparency
5.0
Claim Safety
6.5
Documentation
5.5

Audit Analysis

A standard CDM wind farm project in China using the well-established ACM0002 methodology, with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality. The main limitations are the absence of any monitoring-period data or verified emission reductions in the available record, and the lack of documented safeguards mechanisms such as FPIC or a grievance process. No contradictions were found across documents, and the 6 corrective action requests raised during validation were all closed.

Red Flags

  • No monitoring reports or verified emission reduction figures found in the extracted record — only the ex-ante claimed total of 822,290 tCO2e is available
  • No buffer pool or explicit permanence mechanism documented, though reversal risk is inherently low for a wind displacement project
  • Safeguards are mentioned in the PDD but no FPIC process or grievance mechanism is described in the available documents

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

low inherent risk for wind

Leakage

0% deemed negligible, consistent with wind

Baseline

Jurisdictional grid EF, standard for wind

Safeguards

Mentioned but no FPIC or grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents