Guohua Zhucheng Wind Farm Project (Phase II)
#218of 1935 in Renewable energy#72of 1084 in China#132of 1459 in CDM (UNFCCC)#156of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in China with a solid combined additionality test confirmed by Bureau Veritas and no inherent reversal risk, but undermined by three material contradictions between the validation and monitoring reports (baseline method, leakage justification, and ERR figures). The project is a straightforward renewable-energy generation activity with reasonable leakage treatment, yet the absence of a stated buffer pool, missing FNRB and usage-monitoring details, and unresolved baseline-method ambiguity limit confidence in the credit claims.
Red Flags
- Baseline method is stated as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report — a fundamental methodological contradiction that affects the validity of the emissions-reduction calculation.
- Total ERR figures differ by 60% between the validation report (87,623 tCO₂e) and the monitoring report (140,125 tCO₂e); the basis for each figure (annual vs. full crediting period vs. single monitoring period) is not clarified in the extracted record.
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified even though wind generation carries low inherent reversal risk.
- Six corrective actions were required during validation (including IRR recalculation and baseline emission-factor revision), indicating the initial PDD contained material errors that had to be fixed before registration.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 140,125 | 0 | 140,125 | |
| Total | 140,125 | 0 | 140,125 |
Risk Indicators
Combined test, VVB-confirmed
Wind generation, no reversal risk
0% with quantified justification
Method contradicts across reports
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →