Audit Analysis
A standard CDM wind project in China with a jurisdictional grid baseline and VVB-confirmed additionality, but the available record is limited to the validation report with no verification reports or verified ERR figures. A significant discrepancy between the PDD (636,307 tCO₂e) and the validation report (90,901 tCO₂e) raises data-reliability concerns, and six material findings at validation (including a non-conservative baseline EF calculation) indicate the initial documentation required substantial correction.
Red Flags
- Total ERR claimed differs by a factor of ~7 between the PDD (636,307) and the validation report (90,901); the basis for the discrepancy is not explained in the extracted record.
- No verification reports or verified ERR figures are available in the extracted record, so actual delivery against the claimed 90,901 tCO₂e cannot be assessed.
- The validation report identified that the initial PDD baseline emission factor was rounded up rather than down (non-conservative), requiring recalculation and correction.
- Buffer pool percentage and reversal-event history are not stated in any available document.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% deemed negligible, reasonable for wind
Jurisdictional grid EF (0.8958, 2011)
Mentioned, benefit sharing described; FPIC and grievance mec
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →