A CDM wind power project in China with a solid combined additionality test verified by Bureau Veritas and a jurisdictional baseline, but significant data gaps including no verification report, no buffer pool documentation, and a major discrepancy between the PDD's claimed emissions reductions (642,796 tCO2e) and the validated figure (91,828 tCO2e). The project is inherently low-risk on permanence as a wind avoidance project, but the absence of CORSIA/CCP clarity and the unresolved leakage-justification contradiction temper confidence.
Red Flags
- Massive ERR discrepancy: the PDD claims 642,796 tCO2e while the validation report validates only 91,828 tCO2e — a roughly 7-fold difference that, although resolved in favour of the lower (conservative) figure, signals weak initial project design documentation
- No verification report data is available (total verified ERR is not stated), so actual delivery against the validated baseline cannot be assessed
- Leakage justification is contradictory across documents: the validation report states 'deemed negligible' while an appendix dated 2012-08-30 references a 'quantified' approach
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% deemed negligible, doc contradiction
Jurisdictional, reassessment not documented
Mentioned, FPIC/grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →