Skip to main content
GSSolar Thermal - ElectricityIndiaACM0002

Guttigoli Solar Power Project in Karnataka

GS-1775 ↗ · current registry ID: GS6760

#1112of 1935 in Renewable energy#572of 975 in India#850of 1801 in Gold Standard (GS)#867of 1287 in ACM0002

5.0/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The Guttigoli Solar Power Project is a grid-connected solar thermal facility in Karnataka with VVB-confirmed additionality and no reported reversal events, but it is undermined by a 0% leakage deduction with no stated justification, a project-specific baseline, and an extensive list of material findings and corrective actions spanning both verification and validation reports. The ERR figures are internally consistent (claimed equals verified at 234,877 tCO₂e), yet the pro-rata delivery ratio relative to the lifetime ex-ante estimate raises questions about the monitoring period scope. Documentation quality is further weakened by six cross-document contradictions, including a direct conflict on whether FPIC was conducted.

Red Flags

  • Leakage deduction of 0% with justification recorded as 'not addressed' in the 2025 verification report, despite the project displacing grid electricity where displaced-generation leakage is a recognised risk
  • FPIC status directly contradicted: the 2020 validation report records FPIC as not conducted, while the 2023 PDD states it was conducted — an unresolved conflict on a core safeguard
  • 30+ corrective actions and 15 material findings across the verification and validation reports, including missing calibration certificates, absent grievance records, and unsubmitted CSR/training evidence
  • Baseline method contradicted between the 2025 verification report (project-specific) and the 2025 monitoring report (jurisdictional), creating uncertainty about the actual baseline approach

Credit Vintages

IssuedRetiredAvailable
2018
56,29156,2910
2019
149,445147,1592,286
2020
194,091178,49015,601
2021
188,389158,02530,364
2022
186,998111,00075,998
2023
147,9700147,970
Total923,184650,965272,219

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification not addressed

Baseline

Project-specific baseline, method contradicted across docs

Safeguards

Grievance mechanism present, FPIC status contradicted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002: Grid-connected electricity generation from renewable sources

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents