Ha Tay Hydropower Project
#1115of 1935 in Renewable energy#52of 80 in Vietnam#848of 1459 in CDM (UNFCCC)#362of 806 in AMS-I.D
Audit Analysis
The Ha Tay Hydropower Project is a small-scale CDM hydro project with a confirmed investment-test additionality assessment by TÜV NORD CERT, but its documentation record is marred by six material findings (including PDD calculation errors and an equipment-count correction) and four cross-document contradictions. The project's straightforward avoidance-based design carries low reversal risk, yet the absence of verified ERR figures, safeguards detail, and a consistent baseline characterization limits confidence in the claimed reductions.
Red Flags
- Six material findings in the verification record, including calculation mistakes in the PDD's total output and emission tables and an incorrect turbine/generator count (3 vs 2 units), indicating the foundational project design document contained errors that required correction.
- Two monitoring reports from the same year (April 2020 and October 2020) report materially different total ERR figures (18,932 vs 14,826 tCO₂e), a 28% discrepancy that is not explained in the extracted record.
- Baseline method is characterised as 'project-specific' in the 2020 monitoring report but 'jurisdictional' in the 2016 PDD, creating ambiguity about whether the grid-emission-factor baseline is truly standardised or project-tailored.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 18,314 | 0 | 18,314 | |
| 2017 | 18,565 | 0 | 18,565 | |
| 2018 | 18,148 | 0 | 18,148 | |
| 2019 | 17,418 | 0 | 17,418 | |
| 2020 | 18,932 | 0 | 18,932 | |
| 2021 | 14,826 | 0 | 14,826 | |
| Total | 106,203 | 0 | 106,203 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, justification inconsistent across docs
Method contradictory (project vs jurisdictional)
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →