Skip to main content
GSBiogas - HeatChinaAMS-I.C

Haikou Rural Methane Digesters Project in Hainan Province

GS-461 ↗ · current registry ID: GS2664

#132of 268 in Biogas#745of 1084 in China#1069of 1801 in Gold Standard (GS)#40of 115 in AMS-I.C

4.8/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

The Haikou Rural Methane Digesters Project has a VVB-confirmed additionality assessment and a quantified (albeit zero) leakage deduction, but is undermined by an extensive list of material findings and corrective actions spanning multiple verification cycles, a project-specific modeled baseline with no documented reassessment, and the absence of any buffer pool or permanence mechanism. The project delivered roughly 62% of its pro-rata ex-ante expectation for the elapsed monitoring period, a conservative outcome partly attributable to a documented swine-fever shock, but the volume of unresolved documentation and methodology issues raises meaningful concerns about the robustness of the underlying MRV.

Red Flags

  • Over 20 material findings and 15 corrective actions were raised across verification cycles, including invalid data sources for emission factors, missing units in baseline calculations, and emission calculation methods inconsistent with the PDD
  • No buffer pool, permanence mechanism, or reversal-event tracking is documented, leaving the project exposed to potential credit reversal without a mitigation instrument
  • The project delivered only ~62% of the pro-rata ex-ante expectation for the 2020–2023 monitoring period, with the 2019 annual ER 47.1% below the PDD estimate due to swine fever, indicating sensitivity to external shocks
  • Multiple contradictions exist across documents on ERR figures (110,399 vs 133,046), crediting period start date (2013 vs 2012), and leakage treatment (quantified vs not addressed), reducing confidence in data consistency
  • No Free, Prior and Informed Consent (FPIC), life-cycle assessment, or carbon-content testing is documented despite the project's rural household context

Credit Vintages

IssuedRetiredAvailable
2013
36,28136,2810
2014
53,46653,024442
2015
53,36952,3091,060
2016
53,46252,2541,208
2017
51,99144,9936,998
2018
52,65831,00021,658
2019
28,39716,49411,903
Total329,624286,35543,269

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, quantified but contradictory across VRs

Baseline

Project-specific, modeled, no reassessment date

Safeguards

Grievance & benefit-sharing present; no FPIC or LCA

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05AMS-I.C; AMS-III.R

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents