Skip to main content
CDMHydroChinaAMS-I.D

Hailin Dayangmu Hydropower Project

CDM-9014 ↗

#1376of 1935 in Renewable energy#837of 1084 in China#1111of 1459 in CDM (UNFCCC)#445of 806 in AMS-I.D

4.6/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A small hydropower project in China validated under CDM AMS-I.D. with a VVB-confirmed investment additionality test and a jurisdictional grid-emission-factor baseline. The project carries a high volume of material findings (13 items, 6 corrective actions) at validation, and the available record lacks any monitoring or verification data, limiting confidence in actual delivery. The core methodology is straightforward and low-risk, but documentation gaps and the absence of post-validation evidence prevent a higher assessment.

Red Flags

  • 13 material findings at validation (6 CARs + 7 CLs), including missing reservoir parameters for both baseline and monitoring, turbine/generator spec mismatch, and insufficient tariff sensitivity analysis
  • No monitoring reports, verification reports, or verified ERR figures found in the extracted record despite the crediting period (2013–2019) having ended
  • Baseline method classified inconsistently between the PDD (jurisdictional) and the validation report (project), creating ambiguity about the baseline basis
  • Leakage treatment contradicted between the validation report (deemed negligible) and a financial document (quantified), with no clear reconciliation

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Physical infrastructure, no reversal risk

Leakage

Deemed negligible, plausible for small hydro

Baseline

Grid EF used but method classification inconsistent; no reas

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents