Hainan Chengpo Hydropower Project
#691of 1935 in Renewable energy#338of 1084 in China#479of 1459 in CDM (UNFCCC)#243of 806 in AMS-I.D
Audit Analysis
The Hainan Chengpo small hydro project (CDM-3254) has a solid additionality assessment confirmed by DNV via an investment test, and the 0% leakage deduction is reasonable for a grid-connected hydro avoidance project. However, four contradictions across documents — particularly the baseline method (project vs. jurisdictional) and the crediting period dates — introduce meaningful uncertainty, and the 10 corrective action requests during validation signal quality-control issues. The project is a low-inherent-risk avoidance type, but the documentation gaps and inconsistencies prevent a higher confidence rating.
Red Flags
- Baseline method is stated as 'project-specific' in the monitoring report but 'jurisdictional' in the PDD — a fundamental inconsistency that affects the validity of the baseline calculation
- Crediting period differs between the validation report (2010–2016) and the monitoring report (2011–2017), creating ambiguity about the exact project lifetime and pro-rata ERR expectations
- Ten corrective action requests and five clarification requests were raised during validation, indicating notable quality issues in the original project documentation
- Grid emission factor is from 2006 (0.82335 tCO₂/MWh) and no updated or reassessed value is found in the available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 37,852 | 0 | 37,852 | |
| Total | 37,852 | 0 | 37,852 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, quantified, reasonable for hydro
Method contradiction; 2006 grid EF
Mentioned and benefit sharing described; FPIC/grievance not
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →