Skip to main content
CDMHydroChinaAMS-I.D

Hainan Chengpo Hydropower Project

CDM-3254 ↗

#691of 1935 in Renewable energy#338of 1084 in China#479of 1459 in CDM (UNFCCC)#243of 806 in AMS-I.D

5.5/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

The Hainan Chengpo small hydro project (CDM-3254) has a solid additionality assessment confirmed by DNV via an investment test, and the 0% leakage deduction is reasonable for a grid-connected hydro avoidance project. However, four contradictions across documents — particularly the baseline method (project vs. jurisdictional) and the crediting period dates — introduce meaningful uncertainty, and the 10 corrective action requests during validation signal quality-control issues. The project is a low-inherent-risk avoidance type, but the documentation gaps and inconsistencies prevent a higher confidence rating.

Red Flags

  • Baseline method is stated as 'project-specific' in the monitoring report but 'jurisdictional' in the PDD — a fundamental inconsistency that affects the validity of the baseline calculation
  • Crediting period differs between the validation report (2010–2016) and the monitoring report (2011–2017), creating ambiguity about the exact project lifetime and pro-rata ERR expectations
  • Ten corrective action requests and five clarification requests were raised during validation, indicating notable quality issues in the original project documentation
  • Grid emission factor is from 2006 (0.82335 tCO₂/MWh) and no updated or reassessed value is found in the available documents

Credit Vintages

IssuedRetiredAvailable
2012
37,852037,852
Total37,852037,852

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, quantified, reasonable for hydro

Baseline

Method contradiction; 2006 grid EF

Safeguards

Mentioned and benefit sharing described; FPIC/grievance not

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents