Hainan Dongfang Sigeng Wind Farm Phase I Project(48MW)
#145of 1935 in Renewable energy#42of 1084 in China#88of 1459 in CDM (UNFCCC)#104of 1287 in ACM0002
Audit Analysis
A 48 MW CDM wind project in Hainan, China, with a well-supported additionality case (combined test, IRR 6.02% below the 8% benchmark) confirmed by TÜV SÜD. The jurisdictional grid-emission-factor baseline is standard for ACM0002 wind projects, and no reversal risk is inherent to the technology. However, the leakage justification is weak (0% deduction with the later monitoring report stating it was 'not addressed'), several key MRV parameters are missing from the extracted record, and multiple contradictions across documents reduce confidence in data consistency.
Red Flags
- Leakage justification contradicts itself across two monitoring reports: the 2012 report describes it as 'quantified' while the 2013 report states it was 'not addressed'; the 0% deduction lacks a clear, consistent rationale in the most recent document.
- Total verified ERR is not found in the extracted record, preventing any pro-rata delivery check against the 82,653 tCO₂ lifetime claim.
- Crediting period differs between the PDD (2011-03-01 to 2018-02-28) and the 2013 monitoring report (2010-12-20 to 2017-12-19), creating ambiguity about the approved project duration.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 47,440 | 0 | 47,440 | |
| 2012 | 74,958 | 0 | 74,958 | |
| 2014 | 82,619 | 0 | 82,619 | |
| Total | 205,017 | 0 | 205,017 |
Risk Indicators
VVB-confirmed combined test, IRR below benchmark
Wind generation, no reversal risk, no events reported
0% deduction, justification inconsistent across reports
Jurisdictional grid EF, standard ACM0002 methodology
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →