Hainan Gezhen Hydropower Project
#771of 1935 in Renewable energy#381of 1084 in China#550of 1459 in CDM (UNFCCC)#600of 1287 in ACM0002
Audit Analysis
The Hainan Gezhen Hydropower Project is a small-scale CDM hydro project with VVB-confirmed additionality via an investment test, but the validation process surfaced nine material findings including IRR sensitivity near the benchmark and baseline calculation errors. Multiple contradictions between the PDD, validation report, and monitoring report (baseline method, leakage justification, ERR figures, and crediting period dates) reduce confidence in the data record. The project is a straightforward grid-displacement hydro scheme with reasonable leakage treatment, but the CDM-era documentation and sensitivity of the additionality case limit overall quality.
Red Flags
- IRR sensitivity analysis showed the project's internal rate of return approaching the benchmark with only a 10% variation in tariff or investment, weakening the additionality case (validation report, 2011).
- Nine material findings were raised at validation, including an ecological flow value in the PDD inconsistent with the EIA, an unexplained decrease in annual power generation in the IRR calculation, and missing descriptions of meter installation, corrective action procedures, and data archiving.
- The baseline method is described as 'project-specific' in the monitoring report but 'jurisdictional' in the PDD — an unresolved contradiction that affects the credibility of the baseline calculation.
- The grid emission factor is from 2008 and no baseline reassessment date is recorded in the available documents.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 130,665 | 0 | 130,665 | |
| Total | 130,665 | 0 | 130,665 |
Risk Indicators
VVB-confirmed but IRR-sensitive
no reversal data
0% deduction, quantified, reasonable for hydro
Project-specific; method contradiction across docs
Mentioned but no FPIC or grievance detail
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →