Hainan Lingao Solar Project
#1527of 1935 in Renewable energy#966of 1084 in China#1308of 1459 in CDM (UNFCCC)#1164of 1287 in ACM0002
Audit Analysis
The Hainan Lingao Solar Project is a CDM-registered solar PV installation with a jurisdictional grid baseline and VVB-confirmed additionality, but the validation report identified nine corrective action requests including IRR calculation errors, monitoring system discrepancies, and a ten-fold discrepancy in the claimed emission reduction figure between the PDD and the validation report. The low extraction confidence and numerous missing data points (monitoring period, verified ERR, FNRB, usage rates) limit the ability to confirm the project's actual performance against its claims.
Red Flags
- Ten-fold discrepancy in total ERR: the PDD states 217,404 tCO2e while the validation report states 21,740 tCO2e — a factor-of-10 error that raises serious over-crediting risk if the PDD figure was used for issuance
- Nine corrective action requests in the validation report, including IRR calculation errors in depreciation and loan payment sheets, missing sensitivity analysis, and a monitoring system description that does not match actual site conditions
- Leakage justification is contradictory: the validation report states 'deemed negligible' while an appendix references a 'quantified' approach, with no clear reconciliation
- Low extraction confidence across the document set, meaning key operational and monitoring data may be missing or misread
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but with calculation errors and test-type cont
Solar PV — no biotic carbon store, no reversal risk
0% deduction, justification contradicted across documents
Jurisdictional grid EF (0.7887, 2011), standard method
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated — dual-channel risk unasses
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →