Hamsi Hybrid Wind and Solar Power Project
#1259of 1935 in Renewable energy#20of 75 in TR#43of 154 in Intl. Carbon Registry (ICR)#978of 1287 in ACM0002
Audit Analysis
The Hamsi Hybrid Wind and Solar project in Turkey uses a jurisdictional baseline and a combined additionality test, with no reversal events and a reasonable leakage justification for a grid-connected renewable. However, the absence of verified ERR figures, an unconfirmed VVB, a significant discrepancy between two PDD versions on claimed emissions reductions, and low extraction confidence collectively limit confidence in the project's data integrity and transparency.
Red Flags
- Claimed ERR differs by a factor of ~2 between two PDD versions (173,582 in Oct 2025 vs 351,577 in Dec 2025), raising data-reliability concerns
- No verified ERR figure is present in the extracted record despite a monitoring period running through June 2025
- VVB name and additionality verification status are not stated in any available document
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 44,908 | 0 | 44,908 | |
| 2022 | 87,654 | 0 | 87,654 | |
| 2023 | 87,654 | 0 | 87,654 | |
| 2024 | 87,654 | 0 | 87,654 | |
| 2025 | 87,654 | 0 | 87,654 | |
| 2026 | 87,654 | 0 | 87,654 | |
| 2027 | 87,654 | 0 | 87,654 | |
| 2028 | 87,654 | 0 | 87,654 | |
| 2029 | 87,654 | 0 | 87,654 | |
| 2030 | 87,654 | 0 | 87,654 | |
| 2031 | 87,654 | 0 | 87,654 | |
| Total | 921,448 | 0 | 921,448 |
Risk Indicators
Combined test present; VVB confirmation not stated
No reversals
0% deduction; negligible for grid-connected renewable
Jurisdictional method; reassessment timing not stated
FPIC, grievance mechanism, and benefit sharing documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →