Skip to main content
CDMWindChinaACM0002

Hangjin Yihewusu Phase I 49.5MW Wind Power Project

CDM-7221 ↗

#1051of 1935 in Renewable energy#597of 1084 in China#778of 1459 in CDM (UNFCCC)#831of 1287 in ACM0002

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A 49.5 MW onshore wind project in Inner Mongolia, China, registered under CDM with a combined additionality test confirmed by the VVB. The project shows reasonable pro-rata delivery (~96% of expected credits for the monitoring period), but is undermined by four cross-document contradictions (baseline method, leakage justification, ERR figures, crediting period), 15 material findings at validation, and the absence of any permanence or reversal-risk safeguards in the extracted record.

Red Flags

  • Four contradictions between the validation report (2012) and the monitoring report (2016) on baseline method, leakage justification, ERR figures, and crediting period dates
  • 15 material findings at validation (1 CAR + 14 CLs) including missing wind-speed data, absent stakeholder-consultation evidence, and an unresolved CAR requiring Letters of Agreement from both PRC and UK designated authorities
  • No buffer pool, reversal-event tracking, or permanence safeguard documented for a finite-life wind asset
  • PDD is dated 2015-02-03, which post-dates the validation report (2012-09-04), raising questions about document chronology and version control

Credit Vintages

IssuedRetiredAvailable
2015
189,8600189,860
2016
135,9020135,902
Total325,7620325,762

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification across documents

Baseline

Method contradiction (project vs jurisdictional); grid EF fr

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents