Hangjin Yihewusu Phase I 49.5MW Wind Power Project
#1051of 1935 in Renewable energy#597of 1084 in China#778of 1459 in CDM (UNFCCC)#831of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in Inner Mongolia, China, registered under CDM with a combined additionality test confirmed by the VVB. The project shows reasonable pro-rata delivery (~96% of expected credits for the monitoring period), but is undermined by four cross-document contradictions (baseline method, leakage justification, ERR figures, crediting period), 15 material findings at validation, and the absence of any permanence or reversal-risk safeguards in the extracted record.
Red Flags
- Four contradictions between the validation report (2012) and the monitoring report (2016) on baseline method, leakage justification, ERR figures, and crediting period dates
- 15 material findings at validation (1 CAR + 14 CLs) including missing wind-speed data, absent stakeholder-consultation evidence, and an unresolved CAR requiring Letters of Agreement from both PRC and UK designated authorities
- No buffer pool, reversal-event tracking, or permanence safeguard documented for a finite-life wind asset
- PDD is dated 2015-02-03, which post-dates the validation report (2012-09-04), raising questions about document chronology and version control
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 189,860 | 0 | 189,860 | |
| 2016 | 135,902 | 0 | 135,902 | |
| Total | 325,762 | 0 | 325,762 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, contradictory justification across documents
Method contradiction (project vs jurisdictional); grid EF fr
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →