Hebei Bode Shenlong Xiaoertai wind power project
#441of 1935 in Renewable energy#175of 1084 in China#287of 1459 in CDM (UNFCCC)#329of 1287 in ACM0002
Audit Analysis
A CDM wind power project in Hebei, China, with a VVB-confirmed combined additionality test and a standard grid-emission-factor baseline. The project shows conservative under-delivery relative to its ex-ante estimate, but the leakage justification is absent, the baseline method is inconsistently described across documents, and several key monitoring and eligibility fields remain unreported.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the monitoring report, despite a contradictory 'quantified' entry in the same document
- Baseline method described as 'project' in the monitoring report but 'jurisdictional' in the validation report — an unresolved inconsistency
- Verified ERR for the monitoring period (15,422 tCO₂e) is only ~10% of the pro-rata expectation (~154,500 tCO₂e), raising questions about actual generation or reporting completeness
- Six material findings (CARs) were raised during validation, including gaps in financial parameters, QA/QC procedures, and applicability demonstration
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 77,715 | 0 | 77,715 | |
| 2016 | 309,073 | 0 | 309,073 | |
| Total | 386,788 | 0 | 386,788 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, justification not addressed
Grid EF 2010, method inconsistent across docs
Mentioned, FPIC and grievance not stated
CORSIA and CCP status unreported
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →