A standard 49.5 MW onshore wind project under CDM methodology ACM0002 with VVB-confirmed additionality and a jurisdictional grid baseline, but the record is marred by seven material findings (two corrective actions, five clarifications), four inter-document contradictions, and the absence of a verified emissions reduction figure. The project's fundamental design is sound, yet data reliability and documentation completeness limit confidence in the claimed reductions.
Red Flags
- Two contradictory total_err_claimed values (377,527 and 33,536) appear within the same monitoring report (2016-07-20), creating an unresolved data reliability issue
- Seven material findings at validation, including two corrective actions (missing DNA Letters of Approval, incorrect IRR tax calculation) and five clarifications on baseline, financial parameters, and metering details
- No verified emissions reduction figure (total_err_verified) is available in the extracted record, preventing independent confirmation of claimed reductions
- Baseline method is described as 'project' in the monitoring report but 'jurisdictional' in the validation report — an unresolved contradiction on a core methodological parameter
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 377,527 | 0 | 377,527 | |
| Total | 377,527 | 0 | 377,527 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, justification wording inconsistent across docs
Grid EF 2009, method label contradicts between docs
Safeguards mentioned but FPIC and grievance mechanism not do
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →