Audit Analysis
A CDM wind project verified by SGS United Kingdom Ltd with a jurisdictional grid-emission-factor baseline and confirmed investment-test additionality. The verified emissions reductions (172,606 tCO₂e) closely match the claimed figure for the monitoring period, but the verification report flagged 11 material findings including a turbine-mix discrepancy versus the registered PDD, and the grid emission factor dates from 2006. Multiple cross-document contradictions on baseline method, additionality test type, and crediting period dates reduce confidence in the internal consistency of the project record.
Red Flags
- CAR#2 in the verification report: actual installed turbine mix was inconsistent with the registered PDD, raising questions about whether the registered capacity and emission factors still apply
- Grid emission factor of 1.0548 tCO₂/MWh is from 2006; if the Chinese grid has decarbonised since, the true reduction per MWh is lower than claimed
- Eleven material findings and seven corrective actions were raised in the verification report, including missing monitoring equipment data and incomplete QA/QC procedures
- Crediting period dates differ between the validation report (2010-01-01 to 2016-12-31) and the verification report (2010-09-01 to 2017-08-31), creating ambiguity about the exact registration window
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 172,606 | 0 | 172,606 | |
| Total | 172,606 | 0 | 172,606 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0 % deduction, negligible for grid wind
Jurisdictional grid EF from 2006, doc inconsistency
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →