Skip to main content
CDMWindChinaACM0002

Hebei Chengde Runfeng Wind Farm Project

CDM-4073 ↗

#222of 1935 in Renewable energy#77of 1084 in China#137of 1459 in CDM (UNFCCC)#159of 1287 in ACM0002

6.3/ 10
Integrity
6.8
Transparency
5.8
Claim Safety
6.2
Documentation
6.2

Audit Analysis

A CDM wind farm project with a solid combined additionality test verified by DNV and a reasonable grid-emission-factor baseline, but hampered by a baseline-method contradiction between the validation and monitoring reports, six material findings (all subsequently addressed), and a thin monitoring record covering only a single 15-month period. The project shows no reversal risk typical of avoidance-type wind credits, and leakage is reasonably deemed negligible.

Red Flags

  • Baseline method is recorded as 'project' in the monitoring report but 'jurisdictional' in the validation report — an unresolved contradiction that undermines confidence in the baseline design
  • Six material findings were raised during validation, including a cut-in-speed parameter inconsistency between the PDD and the financial statement report, and a need to justify the electricity tariff against the highest approved Hebei Province tariffs
  • Only a single monitoring period (Jan 2011 – Apr 2012) is visible in the extracted record; no subsequent monitoring reports or verified ERR figures are available
  • CORSIA eligibility and CCP status are both unstated, leaving the double-claiming risk unassessed

Credit Vintages

IssuedRetiredAvailable
2013
116,4260116,426
Total116,4260116,426

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

Avoidance-type wind, no reversal risk

Leakage

0 % deemed negligible, reasonable for wind

Baseline

Method contradiction; 2010 grid EF

Safeguards

Mentioned; FPIC & grievance not stated

Double-claim

CORSIA & CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents