Hebei Chengde Songshan Wind Farm Project
#184of 1935 in Renewable energy#58of 1084 in China#111of 1459 in CDM (UNFCCC)#129of 1287 in ACM0002
Audit Analysis
A CDM wind project with a solid additionality assessment (combined test confirmed by DNV-CUK) and inherently low reversal risk, but hampered by contradictions in baseline methodology and leakage justification across documents, and a notable absence of verified ERR figures. The project is fundamentally low-risk for over-crediting given the wind technology, yet documentation gaps and unresolved discrepancies prevent a higher confidence rating.
Red Flags
- Baseline method is described as 'project' in the 2011 monitoring report but 'jurisdictional' in the 2007 validation report — an unresolved contradiction that affects baseline credibility
- Leakage justification is stated as 'quantified' in the monitoring report but 'deemed negligible' in the validation report, with a 0% deduction in both cases
- Total verified ERR is not stated in any available document, preventing independent verification of actual emissions reductions
- Three material findings at validation (missing DNA approval letters, missing IRR spreadsheet, outdated operating margin data) required corrective actions
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 24,269 | 0 | 24,269 | |
| 2008 | 46,584 | 0 | 46,584 | |
| 2009 | 81,055 | 0 | 81,055 | |
| 2010 | 118,726 | 0 | 118,726 | |
| 2011 | 91,361 | 0 | 91,361 | |
| 2012 | 109,315 | 0 | 109,315 | |
| Total | 471,310 | 0 | 471,310 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% deduction, contradictory justification
Method contradicts across documents
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →