Hebei Chengde Weichang Yudaokou Ruyihe Wind Power Project
#692of 1935 in Renewable energy#339of 1084 in China#480of 1459 in CDM (UNFCCC)#534of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China using the standard ACM0002 methodology with a jurisdictional grid-average baseline. The project delivered approximately 212% of its pro-rata ex-ante expectation for the 2020 monitoring period, consistent with wind variability. Key gaps include unconfirmed additionality verification in the extracted record and inconsistent leakage treatment language between the validation and monitoring reports.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record; the PDD is listed as evidence but the specific test (investment, barrier, or regulatory) could not be confirmed
- Leakage justification is inconsistent: the validation report (2020) states 'deemed negligible' while the monitoring report (2022) records 'not addressed', creating ambiguity in the project's leakage treatment
- A material finding in the monitoring report identified an incorrect second crediting period start date (2013 vs. the correct 2020), corrected via a corrective action, indicating a documentation quality lapse
- One of the five evidence documents is listed as 'unknown', reducing confidence in the completeness of the documentary record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 392,456 | 0 | 392,456 | |
| 2021 | 1,657,720 | 0 | 1,657,720 | |
| 2022 | 394,390 | 0 | 394,390 | |
| Total | 2,444,566 | 0 | 2,444,566 |
Risk Indicators
Test likely in PDD but not confirmed in extracted record
Avoidance project, no reversal risk
0% deduction, justification inconsistent between documents
Jurisdictional grid EF, reassessed 2020
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated; CDM-registered
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →